Management Of Cost Overrun In Selected Building Construction Project In Warri

  • Ms Word Format
  • 68 Pages
  • ₦3000
  • 1-5 Chapters
MANAGEMENT OF COST OVERRUN IN SELECTED BUILDING CONSTRUCTION PROJECT IN WARRI

 

Title Page———i

Certification——–ii

Dedication———iii

Acknowledgement——-iv

Abstract ———vi

Table of Content——–vii

 

Chapter One

1.0 Introduction ——-1

1.1 Statement of Problem——4

1.2 Purpose of the Study——5

1.3 Significance of Study——8

1.4 Limitation——–9

1.5 Scope of Study——-11

 

Chapter Two

2.0 Review of Related Literature —-12

2.6 Summary of Literature Review—- 19

 

Chapter Three

3.0 Research Methodology and Procedure—22

3.1 Population ——–22

3.2 Sample and Sampling Technique—-22

3.3 Validation of the Instrument —-23

3.4 Reliability of the Instrument —–23

3.5 Data Analysis——-23

 

Chapter Four

4.0 Presentation and Discussion of Result—24

4.1 Analysis and interpretaion of Data—25

4.2 Discussion of Results——38

 

Chapter Five

5.0. Summary, Conclusion, and Recommendation  –40

5.1 Summary——–40

5.2 Conclusion——–41

5.3 Recommendation——42

References ———45

Appendix 1——–47

Appendix ———50

Leave a Reply

Your email address will not be published. Required fields are marked *

You May Also Like