A Critical Review Of The Causes Of Cost Overrun In Construction Industries In Developing Countries

  • Ms Word Format
  • 75 Pages
  • ₦3000
  • 1-5 Chapters

A CRITICAL REVIEW OF THE CAUSES OF COST OVERRUN IN CONSTRUCTION INDUSTRIES IN DEVELOPING COUNTRIES

 

TABLE CONTENTS

Title Page———i

Certification——–ii

Dedication———iii

Acknowledgement——-iv

Abstract ———vi

Table of Content——–vii

 

Chapter One

1.0 Introduction ——-1

1.1 Statement of Problem——4

1.2 Purpose of the Study——5

1.3 Significance of Study——8

1.4 Limitation——–9

1.5 Scope of Study——-11

 

Chapter Two

2.0 Review of Related Literature —-12

2.6 Summary of Literature Review—- 19

 

Chapter Three

3.0 Research Methodology and Procedure—22

3.1 Population ——–22

3.2 Sample and Sampling Technique—-22

3.3 Validation of the Instrument —-23

3.4 Reliability of the Instrument —–23

3.5 Data Analysis——-23

 

Chapter Four

4.0 Presentation and Discussion of Result—24

4.1 Analysis and interpretaion of Data—25

4.2 Discussion of Results——38

 

Chapter Five

5.0. Summary, Conclusion, and Recommendation  –40

5.1 Summary——–40

5.2 Conclusion——–41

5.3 Recommendation——42

References ———45

Appendix 1——–47

Appendix ———50

A CRITICAL REVIEW OF THE CAUSES OF COST OVERRUN IN CONSTRUCTION INDUSTRIES IN DEVELOPING COUNTRIES

0 Shares:
Leave a Reply

Your email address will not be published. Required fields are marked *

You May Also Like